Free tools

Tools

Simple calculators for homeowners, students and new contractors planning a build. Results are estimates for a first budget and schedule; final quantities and sizes should be checked by a licensed engineer.

Construction estimates

Concrete materials

Cement, sand and gravel for a slab, footing, column or beam. Enter the size of one pour and how many there are.

Usually for footings, columns, beams and suspended slabs.

Materials
12 bags
of cement (40 kg)
Sand 0.63 m³ · Gravel 1.26 m³
1.2 m³ of concrete, 1.26 m³ with allowance

Rule-of-thumb quantities for site-mixed concrete. Reinforcing steel, formwork and labor are not included. The mix for structural members is set by your structural engineer.

Hollow block wall

Number of concrete hollow blocks, plus cement and sand for laying and plastering a wall.

Materials
394 blocks
for 30 m² of wall (40 × 20 cm blocks, 12.5 per m²)
Cement 29 bags · Sand 2.38 m³

Cement and sand cover laying mortar, core fill and the plaster chosen. Reinforcing bars, tie wire and labor are not included.

Simple cost estimate

List your materials, labor and other costs, then add contingency, overhead and profit, and VAT to see a rough project total.

  1. ₱250,000
  2. ₱120,000
  3. ₱30,000
Estimated project cost
₱540,960
Direct cost
₱400,000
Contingency
₱20,000
Overhead and profit
₱63,000
VAT
₱57,960

A first budget only. Nothing you type here is saved or sent. A firm price needs plans, a site visit and a detailed bill of quantities.

Request a quote

Project planning

Finish date

Turn the number of working days into a target completion date for your schedule.

Target finish
Feb 2, 2027
70 calendar days, about 10.0 weeks

Holidays, permit waiting time and rain days are not counted. Add them to the working days for a safer target.

Electrical

Voltage drop check

Check whether a copper wire size keeps the voltage drop within the limit.

Result
2.18%
8.71 V drop on 400 V
Within 3% limit

Estimate only. Copper resistance at 75 °C (21.7 Ω·mm²/km); reactance ignored, so results for large cables run slightly low. Verify final sizing with a licensed electrical engineer.

Monthly electricity bill estimate

Estimate a monthly bill and what a saving would be worth.

Estimate
₱36,144
per month at the rate above
Saving 20% ≈ ₱7,229 per month, ₱86,746 per year

Default rate: Meralco overall rate, October 2026 (₱15.06/kWh, BusinessWorld, 13 Oct 2026). Commercial and industrial tariffs differ.

Book an energy audit